Pages that link to "Item:Q1639885"
From MaRDI portal
The following pages link to Mathematical programming models for competitive two-agent single-machine scheduling with flexible periodic maintenance activities (Q1639885):
Displaying 4 items.
- Mixed integer programming formulations for two-machine flow shop scheduling with an availability constraint (Q1640598) (← links)
- Proportionate flow shop scheduling with multi-agents to maximize total gains of JIT jobs (Q1640602) (← links)
- Single-machine scheduling with workload-dependent maintenance duration to minimize maximum lateness (Q1666458) (← links)
- Maintenance scheduling problem with fuzzy random time windows on a single machine (Q1707500) (← links)