Pages that link to "Item:Q1651597"
From MaRDI portal
The following pages link to A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem (Q1651597):
Displaying 11 items.
- An iterative path-breaking approach with mutation and restart strategies for the MAX-SAT problem (Q1725596) (← links)
- Meta-heuristic solution with considering setup time for multi-skilled project scheduling problem (Q2120134) (← links)
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty (Q2156293) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- An evolutionary approach for resource constrained project scheduling with uncertain changes (Q2664456) (← links)
- A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource (Q5059351) (← links)
- An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains (Q5244304) (← links)
- Modeling frameworks for the multi‐skill resource‐constrained project scheduling problem: a theoretical and empirical comparison (Q6088125) (← links)
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic (Q6088236) (← links)
- An efficient relax-and-solve method for the multi-mode resource constrained project scheduling problem (Q6588464) (← links)