Pages that link to "Item:Q1653364"
From MaRDI portal
The following pages link to Algorithms for the unrelated parallel machine scheduling problem with a resource constraint (Q1653364):
Displaying 6 items.
- Exact methods for order acceptance and scheduling on unrelated parallel machines (Q1725610) (← links)
- Bi-objective parallel machine scheduling with additional resources during setups (Q2030593) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Constraint programming and local search heuristic: a matheuristic approach for routing and scheduling feeder vessels in multi-terminal ports (Q2226489) (← links)
- Enhanced salp swarm algorithm based on firefly algorithm for unrelated parallel machine scheduling with setup times (Q2243380) (← links)
- Bicriterion scheduling with truncated learning effects and convex controllable processing times (Q6070521) (← links)