Pages that link to "Item:Q1728364"
From MaRDI portal
The following pages link to A PTAS for a resource scheduling problem with arbitrary number of parallel machines (Q1728364):
Displaying 5 items.
- EPTAS for load balancing problem on parallel machines with a non-renewable resource (Q2085740) (← links)
- Minimizing makespan on a single machine with release dates and inventory constraints (Q2184096) (← links)
- Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints (Q2294889) (← links)
- EPTAS for load balancing problem on parallel machines with a non-renewable resource (Q6108926) (← links)
- Scheduling with non-renewable resources: minimizing the sum of completion times (Q6547136) (← links)