Pages that link to "Item:Q1733093"
From MaRDI portal
The following pages link to A worker constrained flexible job shop scheduling problem with sequence-dependent setup times (Q1733093):
Displaying 7 items.
- A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers (Q2030539) (← links)
- A survey of job shop scheduling problem: the types and models (Q2146994) (← links)
- New solution procedures for the order picker routing problem in U-shaped Pick areas with a movable depot (Q2152010) (← links)
- Optimization of the integrated problem of employee timetabling and job shop scheduling (Q2669607) (← links)
- Semiconductor final-test scheduling under setup operator constraints (Q2669721) (← links)
- An algorithm selection approach for the flexible job shop scheduling problem: choosing constraint programming solvers through machine learning (Q2672113) (← links)
- A novel heuristic method for the energy-efficient flexible job-shop scheduling problem with sequence-dependent set-up and transportation time (Q6048213) (← links)