Pages that link to "Item:Q1744241"
From MaRDI portal
The following pages link to Scheduling cooperative gantry cranes with seaside and landside jobs (Q1744241):
Displaying 6 items.
- An exact solution approach for scheduling cooperative gantry cranes (Q1991263) (← links)
- Routing two stacking cranes with predetermined container sequences (Q2059087) (← links)
- Twin-crane scheduling during seaside workload peaks with a dedicated handshake area (Q2124909) (← links)
- A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals (Q2286432) (← links)
- Approximation algorithms for the twin robot scheduling problem (Q2305018) (← links)
- Straddle carrier routing at seaport container terminals in the presence of short term quay crane buffer areas (Q2315629) (← links)