Pages that link to "Item:Q1744527"
From MaRDI portal
The following pages link to A hybrid constraint programming/mixed integer programming framework for the preventive signaling maintenance crew scheduling problem (Q1744527):
Displayed 5 items.
- Constraint programming approaches to disassembly line balancing problem with sequencing decisions (Q2026975) (← links)
- Type-2 integrated process-planning and scheduling problem: reformulation and solution algorithms (Q2146989) (← links)
- Railway crew scheduling: models, methods and applications (Q2286960) (← links)
- An extension of Queiroz and Miyazawa's method for vertical stability in two-dimensional packing problems to deal with horizontal stability (Q5059170) (← links)
- Multi-objective model for optimizing railway infrastructure asset renewal (Q5059239) (← links)