Pages that link to "Item:Q1752139"
From MaRDI portal
The following pages link to Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions (Q1752139):
Displaying 7 items.
- Underground mine scheduling of mobile machines using constraint programming and large neighborhood search (Q2664365) (← links)
- Storage Yard Management: Modelling and Solving (Q5111125) (← links)
- Lexicographic goal programming approach for a short-term mining planning problem (Q6048508) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)
- An optimization model for the real-time truck dispatching problem in open-pit mining operations (Q6088529) (← links)
- Short-term open-pit production scheduling optimizing multiple objectives accounting for shovel allocation in stockpiles (Q6159503) (← links)
- A nested multiple-objective optimization algorithm for managing production fleets in surface mines (Q6495564) (← links)