Pages that link to "Item:Q1752254"
From MaRDI portal
The following pages link to A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem (Q1752254):
Displaying 14 items.
- npuScheduler (Q37534) (← links)
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem (Q1651597) (← links)
- Meta-heuristic solution with considering setup time for multi-skilled project scheduling problem (Q2120134) (← links)
- The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds (Q2215556) (← links)
- Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms (Q2218447) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains (Q5244304) (← links)
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic (Q6088236) (← links)
- Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates (Q6112409) (← links)
- Resource-constrained multi-project scheduling problem: a survey (Q6112820) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)
- Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns (Q6588469) (← links)
- A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty (Q6601552) (← links)