Pages that link to "Item:Q1753475"
From MaRDI portal
The following pages link to The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion (Q1753475):
Displaying 7 items.
- Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level (Q1654372) (← links)
- An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability (Q2029972) (← links)
- Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel (Q2184047) (← links)
- Scheduling quay cranes and shuttle vehicles simultaneously with limited apron buffer capacity (Q6109309) (← links)
- The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions (Q6113444) (← links)
- Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model (Q6187236) (← links)
- Decomposition algorithms for the robust unidirectional quay crane scheduling problems (Q6568488) (← links)