Pages that link to "Item:Q1753635"
From MaRDI portal
The following pages link to Assemble-to-order systems: a review (Q1753635):
Displaying 19 items.
- Optimal and heuristic policies for assemble-to-order systems with different review periods (Q724063) (← links)
- Setting optimal planned leadtimes in configure-to-order assembly systems (Q1622813) (← links)
- Optimal control of a continuous-time \(W\)-configuration assemble-to-order system (Q1754268) (← links)
- Optimisation model for multi-item multi-echelon supply chains with nested multi-level products (Q2029320) (← links)
- Component allocation in make-to-stock assembly systems (Q2033404) (← links)
- Replenishment decisions for complementary components with supply capacity uncertainty under the CVaR criterion (Q2060403) (← links)
- Robust mechanism design and production structure for assembly systems with asymmetric cost information (Q2140210) (← links)
- Effect of timing on reliability improvement and ordering decisions in a decentralized assembly system (Q2150798) (← links)
- Optimal ordering policy for complementary components with partial backordering and emergency replenishment under spectral risk measure (Q2178073) (← links)
- A novel decomposition-based method for solving general-product structure assemble-to-order systems (Q2184111) (← links)
- Push verse pull: inventory-leadtime tradeoff for managing system variability (Q2189921) (← links)
- The Benefits of State Aggregation with Extreme-Point Weighting for Assemble-to-Order Systems (Q4971393) (← links)
- Preservation of Supermodularity in Parametric Optimization: Necessary and Sufficient Conditions on Constraint Structures (Q4994137) (← links)
- Separable models for interconnected production-inventory systems (Q5106729) (← links)
- Optimal control policies for an inventory system with commitment lead time (Q5226164) (← links)
- Reducing tardy batches by \textit{seru} production: model, exact solution, cooperative coevolution solution, and insights (Q6068681) (← links)
- Synchronization in a two‐supplier assembly system: Combining a fixed lead‐time module with capacitated m<scp>ake‐to‐order</scp> production (Q6077483) (← links)
- Integrating decisions with advance supply information in an assemble‐to‐order system (Q6081919) (← links)
- Analysis of second order properties of production-inventory systems with lost sales (Q6148751) (← links)