Pages that link to "Item:Q1761126"
From MaRDI portal
The following pages link to Modeling and solving rich quay crane scheduling problems (Q1761126):
Displaying 21 items.
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals (Q319438) (← links)
- Scheduling multiple factory cranes on a common track (Q337056) (← links)
- A reclaimer scheduling problem arising in coal stockyard management (Q341465) (← links)
- A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints (Q513546) (← links)
- A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules (Q742501) (← links)
- Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level (Q1654372) (← links)
- A generalized classification scheme for crane scheduling with interference (Q1698922) (← links)
- Scheduling reclaimers serving a stock pad at a coal terminal (Q1707674) (← links)
- Scheduling quay cranes and yard trucks for unloading operations in container ports (Q1730674) (← links)
- The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion (Q1753475) (← links)
- An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability (Q2029972) (← links)
- Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel (Q2184047) (← links)
- An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem (Q2255903) (← links)
- Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading (Q2293995) (← links)
- Dynamic programming algorithms for the general quay crane double-cycling problem with internal-reshuffles (Q2307494) (← links)
- Double girder bridge crane with double cycling: scheduling strategy and performance evaluation (Q2336415) (← links)
- An efficient and fast local search based heuristic for reel management in a production line of oil extraction pipes (Q2669644) (← links)
- Some complexity results and an efficient algorithm for quay crane scheduling problem (Q5298341) (← links)
- Scheduling quay cranes and shuttle vehicles simultaneously with limited apron buffer capacity (Q6109309) (← links)
- Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model (Q6187236) (← links)
- Decomposition algorithms for the robust unidirectional quay crane scheduling problems (Q6568488) (← links)