Pages that link to "Item:Q1761958"
From MaRDI portal
The following pages link to Production planning in furniture settings via robust optimization (Q1761958):
Displaying 28 items.
- Mathematical models and a heuristic method for the multiperiod one-dimensional cutting stock problem (Q271978) (← links)
- Robust vertex \(p\)-center model for locating urgent relief distribution centers (Q336453) (← links)
- Classification and literature review of integrated lot-sizing and cutting stock problems (Q724044) (← links)
- The integrated lot sizing and cutting stock problem with saw cycle constraints applied to furniture production (Q1652159) (← links)
- A computational study of the general lot-sizing and scheduling model under demand uncertainty via robust and stochastic approaches (Q1652514) (← links)
- Production planning with order acceptance and demand uncertainty (Q1652551) (← links)
- Robust supply chain network design: an optimization model with real world application (Q1699156) (← links)
- Robust inventory control under demand and lead time uncertainty (Q1699168) (← links)
- An uncertain furniture production planning problem with cumulative service levels (Q1701616) (← links)
- The integrated lot sizing and cutting stock problem in an automotive spring factory (Q2056644) (← links)
- A bi-integrated model for coupling lot-sizing and cutting-stock problems (Q2063089) (← links)
- Robust inventory problem with budgeted cumulative demand uncertainty (Q2091209) (← links)
- Bilevel programming approaches to production planning for multiple products with short life cycles (Q2190796) (← links)
- An extended goal programming model for the multiobjective integrated lot-sizing and cutting stock problem (Q2242390) (← links)
- A robust optimization approach for an integrated dynamic cellular manufacturing system and production planning with unreliable machines (Q2285965) (← links)
- Novel robust fuzzy mathematical programming methods (Q2285989) (← links)
- A robust optimization model for humanitarian relief chain design under uncertainty (Q2293449) (← links)
- Master production schedule using robust optimization approaches in an automobile second-tier supplier (Q2303326) (← links)
- Risk-averse two-stage stochastic programs in furniture plants (Q2454333) (← links)
- A robust optimization approach for the unrelated parallel machine scheduling problem (Q2701168) (← links)
- Progressive Selection Method for the Coupled Lot-Sizing and Cutting-Stock Problem (Q4599321) (← links)
- A robust possibilistic programming model for a responsive closed loop supply chain network design (Q5193421) (← links)
- Robust Optimization of Sums of Piecewise Linear Functions with Application to Inventory Problems (Q5740224) (← links)
- Cutting and packing problems under uncertainty: literature review and classification framework (Q6056892) (← links)
- Comparison of different approaches to multistage lot sizing with uncertain demand (Q6080612) (← links)
- Regularized methods for a two-stage robust production planning problem and its sample average approximation (Q6093994) (← links)
- One-dimensional stock cutting resilient against singular random defects (Q6106587) (← links)
- The robust multi-plant capacitated lot-sizing problem (Q6113554) (← links)