Pages that link to "Item:Q1761994"
From MaRDI portal
The following pages link to Branch-and-bound method for minimizing the weighted completion time scheduling problem on a single machine with release dates (Q1761994):
Displaying 7 items.
- Exact algorithms for single-machine scheduling with time windows and precedence constraints (Q310349) (← links)
- A hybrid differential evolution approach based on surrogate modelling for scheduling bottleneck stages (Q342190) (← links)
- Minimizing the makespan on a single machine with flexible maintenances and jobs' release dates (Q1652182) (← links)
- An exact dynamic programming algorithm for the precedence-constrained class sequencing problem (Q2664413) (← links)
- A Bucket Indexed Formulation for Nonpreemptive Single Machine Scheduling Problems (Q2806861) (← links)
- Online heuristic for the preemptive single machine scheduling problem of minimizing the total weighted completion time (Q2926062) (← links)
- A makespan minimization problem for versatile developers in the game industry (Q6186551) (← links)