Pages that link to "Item:Q1772837"
From MaRDI portal
The following pages link to Maximization of solution flexibility for robust shop scheduling (Q1772837):
Displaying 7 items.
- Taking advantage of a diverse set of efficient production schedules: a two-step approach for scheduling with side concerns (Q336423) (← links)
- A bicriteria two-machine flow-shop serial-batching scheduling problem with bounded batch size (Q398896) (← links)
- Maximising the weighted number of activity execution modes in project planning (Q724006) (← links)
- Flexible solutions in disjunctive scheduling: general formulation and study of the flow-shop case (Q1046704) (← links)
- The impact of design uncertainty in engineer-to-order project planning (Q1753659) (← links)
- Solve-and-robustify (Q2268511) (← links)
- Evaluation of a new decision-aid parameter for job shop scheduling under uncertainties (Q5242361) (← links)