Pages that link to "Item:Q1772970"
From MaRDI portal
The following pages link to Group scheduling with controllable setup and processing times: minimizing total weighted completion time (Q1772970):
Displaying 18 items.
- Single machine quadratic penalty function scheduling with deteriorating jobs and group technology (Q611621) (← links)
- Single machine scheduling problem with controllable processing times and resource dependent release times (Q877039) (← links)
- Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times (Q892912) (← links)
- Group sequencing around a common due date (Q937402) (← links)
- Just-in-time scheduling with controllable processing times on parallel machines (Q975765) (← links)
- A unified approach for scheduling with convex resource consumption functions using positional penalties (Q976312) (← links)
- Optimal due date assignment and resource allocation in a group technology scheduling environment (Q991385) (← links)
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources (Q1666672) (← links)
- Bicriterion scheduling with a negotiable common due window and resource-dependent processing times (Q2004709) (← links)
- Single-machine scheduling with machine unavailability periods and resource dependent processing times (Q2242291) (← links)
- Single machine scheduling problem with multiple due windows assignment in a group technology (Q2346511) (← links)
- A survey of scheduling with controllable processing times (Q2381529) (← links)
- A bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due dates (Q2434249) (← links)
- Single machine group scheduling with time and position dependent processing times (Q2448214) (← links)
- Single-machine group scheduling problems with deterioration consideration (Q2459398) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- Scheduling to Maximize the Number of Just-in-Time Jobs: A Survey (Q2958665) (← links)
- Scheduling identical serial-batching machines in the engine manufacturing supply chain by an integrated variable neighborhood search Algorithm (Q6551161) (← links)