Pages that link to "Item:Q1774493"
From MaRDI portal
The following pages link to Time continuity in discrete time models. New approaches for production planning in process industries. (Q1774493):
Displaying 6 items.
- Multi-level single machine lot-sizing and scheduling with zero lead times (Q621969) (← links)
- Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic (Q1010258) (← links)
- Simultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classification (Q1733088) (← links)
- Multi-stage simultaneous lot-sizing and scheduling for flow line production (Q1936588) (← links)
- A lot-sizing and scheduling model for multi-stage flow lines with zero lead times (Q2253519) (← links)
- Multilevel capacitated lot-sizing and resource-constrained project scheduling: an integrating perspective (Q5712036) (← links)