Pages that link to "Item:Q1788999"
From MaRDI portal
The following pages link to A note on two-agent scheduling on an unbounded parallel-batching machine with makespan and maximum lateness objectives (Q1788999):
Displaying 12 items.
- Two-agent scheduling on bounded parallel-batching machines with an aging effect of job-position-dependent (Q827243) (← links)
- Two-agent single machine scheduling with forbidden intervals (Q902407) (← links)
- Solving a bi-objective unrelated parallel batch processing machines scheduling problem: a comparison study (Q1651526) (← links)
- Race to idle or not: balancing the memory sleep time with DVS for energy minimization (Q1743492) (← links)
- Bi-objective scheduling on a restricted batching machine (Q1782176) (← links)
- Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost (Q2144217) (← links)
- Two-agent bounded parallel-batching scheduling for minimizing maximum cost and makespan (Q2172079) (← links)
- Two-agent scheduling on a bounded parallel-batching machine with makespan and maximum lateness objectives (Q2176838) (← links)
- Unbounded parallel-batch scheduling with drop-line tasks (Q2304116) (← links)
- Two-agent scheduling problems on a single-machine to minimize the total weighted late work (Q2359798) (← links)
- Min–Max Scheduling of Batch or Drop-Line Jobs Under Agreeable Release and Processing Times (Q5865923) (← links)
- Reduced order model predictive control for parametrized parabolic partial differential equations (Q6106009) (← links)