Pages that link to "Item:Q1807061"
From MaRDI portal
The following pages link to The multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q1807061):
Displaying 25 items.
- On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q280157) (← links)
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (Q337299) (← links)
- Modelling and solving generalised operational surgery scheduling problems (Q342152) (← links)
- Production scheduling with alternative process plans (Q439374) (← links)
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres (Q439612) (← links)
- Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm (Q444285) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- A double genetic algorithm for the MRCPSP/max (Q709102) (← links)
- Reactive scheduling in the multi-mode RCPSP (Q709110) (← links)
- A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags (Q929315) (← links)
- Skilled workforce scheduling in service centres (Q954927) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Lower bounds for resource-constrained project scheduling problems. (Q1399575) (← links)
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources (Q1666672) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q1807061) (← links)
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags (Q1869389) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- Price of anarchy and price of stability in multi-agent project scheduling (Q2288992) (← links)
- An improved MIP-based approach for a multi-skill workforce scheduling problem (Q2434289) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations (Q3458826) (← links)
- A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem (Q3598682) (← links)
- Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective (Q6588462) (← links)