Pages that link to "Item:Q1809829"
From MaRDI portal
The following pages link to Integer programming to schedule a hierarchical workforce with variable demands (Q1809829):
Displaying 26 items.
- An exact algorithm for an integrated project staffing problem with a homogeneous workforce (Q282236) (← links)
- A bicriterion algorithm for the allocation of cross-trained workers based on operational and human resource objectives (Q319921) (← links)
- Polynomially solvable personnel rostering problems (Q320874) (← links)
- A constraint programming based column generation approach to nurse rostering problems (Q339698) (← links)
- A dynamic programming algorithm for days-off scheduling with sequence dependent labor costs (Q835588) (← links)
- Heuristics for workforce planning with worker differences (Q928041) (← links)
- Branching strategies in a branch-and-price approach for a multiple objective nurse scheduling problem (Q969750) (← links)
- Planning production using mathematical programming: The case of a woodturning company (Q1013389) (← links)
- Theoretical and algorithmic results for a class of hierarchical fleet mix problems (Q1042052) (← links)
- A flexible MILP model for multiple-shift workforce planning under annualized hours (Q1044115) (← links)
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints (Q1628053) (← links)
- Emergency medical services and beyond: addressing new challenges through a wide literature review (Q1652096) (← links)
- Solving a multi-objective multi-skilled manpower scheduling model by a fuzzy goal programming approach (Q1667840) (← links)
- Airport ground workforce planning with hierarchical skills: a new formulation and branch-and-price approach (Q1730760) (← links)
- Integer programming models for hierarchical workforce scheduling problems including excess off-days and idle labour times (Q1792014) (← links)
- Designing an annual leave scheduling policy: case of a financial center (Q2086959) (← links)
- A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems (Q2327625) (← links)
- An integer programming model for hierarchical workforce scheduling problem (Q2371357) (← links)
- A resource type analysis of the integrated project scheduling and personnel staffing problem (Q2398432) (← links)
- On the trade-off between staff-decomposed and activity-decomposed column generation for a staff scheduling problem (Q2468737) (← links)
- An integrated staff-sizing approach considering feasibility of scheduling decision (Q2468749) (← links)
- Team-building with answer set programming in the Gioia-Tauro seaport (Q2909524) (← links)
- Corrective maintenance through dynamic work allocation and pre-emption: case study and application (Q3055406) (← links)
- A Novel Approach for the Nurse Scheduling Problem (Q3627707) (← links)
- Worker assignment in cellular manufacturing considering technical and human skills (Q4706291) (← links)
- Contingent manpower planning in a high clock speed industry (Q5438661) (← links)