Pages that link to "Item:Q1821025"
From MaRDI portal
The following pages link to Optimal resource profiles for program scheduling (Q1821025):
Displaying 13 items.
- The scheduling of activities to maximize the net present value of projects (Q721678) (← links)
- A multi-stage non-deterministic model for project scheduling under resources constraints (Q721683) (← links)
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach (Q872140) (← links)
- A multi-objective resource allocation problem in dynamic PERT networks (Q945351) (← links)
- Optimal resource leveling using non-serial dynamic programming (Q1341995) (← links)
- A stochastic model to control project duration and expenditure (Q1342014) (← links)
- Constrained multi-project planning problems: A Lagrangean decomposition approach (Q1342015) (← links)
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints (Q1590046) (← links)
- Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach (Q2366088) (← links)
- Hierarchical models for multi-project planning and scheduling (Q2366089) (← links)
- Time-cost trade-off via optimal control theory in Markov PERT networks (Q2480200) (← links)
- A multi-objective resource allocation problem in PERT networks (Q2488911) (← links)
- A genetic algorithm approach for the time-cost trade-off in PERT networks (Q2572768) (← links)