Pages that link to "Item:Q1823851"
From MaRDI portal
The following pages link to Single machine scheduling to minimize mean absolute lateness: A heuristic solution (Q1823851):
Displaying 8 items.
- Preemption in single machine earliness/tardiness scheduling (Q835565) (← links)
- A decision theory based scheduling procedure for single-machine weighted earliness and tardiness problems (Q1278309) (← links)
- Scheduling a single machine to minimize earliness penalties subject to the SLK due-date determination method (Q1291768) (← links)
- Single machine scheduling to minimize weighted earliness subject to maximum tardiness (Q1373894) (← links)
- Machine scheduling with earliness, tardiness and non-execution penalties (Q1886873) (← links)
- Minimizing the sum of absolute deviations about a common due date for the two-machine flow shop problem (Q1893607) (← links)
- A branch and bound approach for single machine scheduling with earliness and tardiness penalties (Q1963033) (← links)
- A note: maximizing the weighted number of just-in-time jobs for a given job sequence (Q6136084) (← links)