Pages that link to "Item:Q1848633"
From MaRDI portal
The following pages link to Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line (Q1848633):
Displayed 11 items.
- Sequencing mixed-model assembly lines: survey, classification and model critique (Q1011163) (← links)
- \texttt{Absalom}: balancing assembly lines with assignment restrictions (Q1044086) (← links)
- Loading and scheduling of a flexible assembly system by mixed integer programming. (Q1420407) (← links)
- An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem (Q2271118) (← links)
- A classification of assembly line balancing problems (Q2371356) (← links)
- A versatile algorithm for assembly line balancing (Q2383104) (← links)
- Integer programming approach to production scheduling for make-to-order manufacturing (Q2486790) (← links)
- Monolithic versus hierarchical approach to integrated scheduling in a supply chain (Q3055263) (← links)
- Balancing mixed-model assembly lines: a computational evaluation of objectives to smoothen workload (Q3163289) (← links)
- Hierarchical approach to production scheduling in make-to-order assembly (Q5478833) (← links)
- Integrated planning for product module selection and assembly line design/reconfiguration (Q5478848) (← links)