Pages that link to "Item:Q1869720"
From MaRDI portal
The following pages link to The two- and \(m\)-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime (Q1869720):
Displaying 4 items.
- Mixed binary integer programming formulations for the flow shop scheduling problems. A case study: ISD projects scheduling (Q870153) (← links)
- A bicriteria flowshop scheduling with a learning effect (Q949943) (← links)
- A branch-and-bound algorithm for the three-machine flowshop scheduling problem with bicriteria of makespan andtotal flowtime (Q3158872) (← links)
- Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm (Q3430246) (← links)