Pages that link to "Item:Q1870835"
From MaRDI portal
The following pages link to Single hoist cyclic scheduling with multiple tanks: A material handling solution (Q1870835):
Displaying 8 items.
- Scheduling multiple factory cranes on a common track (Q337056) (← links)
- An efficient new heuristic for the hoist scheduling problem (Q342278) (← links)
- Scheduling of a single crane in batch annealing process (Q1017463) (← links)
- A generalized classification scheme for crane scheduling with interference (Q1698922) (← links)
- A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times (Q1762161) (← links)
- A solution for cyclic scheduling of multi-hoists without overlapping (Q2271830) (← links)
- One-dimensional vehicle scheduling with a front-end depot and non-crossing constraints (Q2454369) (← links)
- Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows (Q5058816) (← links)