Pages that link to "Item:Q1890952"
From MaRDI portal
The following pages link to Scheduling shops to minimize the weighted number of late jobs (Q1890952):
Displayed 9 items.
- Maximizing the weighted number of just-in-time jobs in flow shop scheduling (Q835569) (← links)
- A note on the two machine job shop with the weighted late work criterion (Q880589) (← links)
- Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine (Q1037662) (← links)
- Open shop scheduling problems with late work criteria. (Q1421458) (← links)
- A survey of the state-of-the-art of common due date assignment and scheduling research (Q1600949) (← links)
- The two-machine flow-shop problem with weighted late work criterion and common due date (Q1772844) (← links)
- Minimizing tardy jobs in a flowshop with common due date (Q1969838) (← links)
- Scheduling a two-stage flowshop under makespan constraint (Q2476691) (← links)
- Counting and enumeration complexity with application to multicriteria scheduling (Q5920490) (← links)