Pages that link to "Item:Q1926828"
From MaRDI portal
The following pages link to Optimizing the supply chain configuration for make-to-order manufacturing (Q1926828):
Displaying 8 items.
- Production planning and pricing policy in a make-to-stock system with uncertain demand subject to machine breakdowns (Q296705) (← links)
- Two bounds for integrating the virtual dynamic cellular manufacturing problem into supply chain management (Q898713) (← links)
- Optimal workforce assignment to operations of a paced assembly line (Q1694335) (← links)
- Optimal configuration of a green product supply chain with guaranteed service time and emission constraints (Q1754132) (← links)
- Lead-time quotation and hedging coordination in make-to-order supply chain (Q2116847) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Flexible capacity strategy with multiple market periods under demand uncertainty and investment constraint (Q2356261) (← links)
- Production lead-time hedging and order allocation in an MTO supply chain (Q6096615) (← links)