Pages that link to "Item:Q1927267"
From MaRDI portal
The following pages link to Solving project scheduling problem with the philosophy of fuzzy random programming (Q1927267):
Displaying 3 items.
- Uncertain mean-variance model for dynamic project portfolio selection problem with divisibility (Q2272422) (← links)
- Comparison of a fuzzy genetic and simulated annealing algorithm approach for project time-cost tradeoff (Q2336747) (← links)
- Arithmetic operations for LR mixed fuzzy random variables via mean chance measure with applications (Q5275904) (← links)