Pages that link to "Item:Q1944074"
From MaRDI portal
The following pages link to Total completion time minimization in a \(2\)-stage differentiation flowshop with fixed sequences per job type (Q1944074):
Displaying 6 items.
- Relocation scheduling subject to fixed processing sequences (Q282245) (← links)
- A heuristic method for two-stage hybrid flow shop with dedicated machines (Q339604) (← links)
- Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence (Q490158) (← links)
- Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines (Q1651647) (← links)
- Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence (Q2400438) (← links)
- Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time (Q2629637) (← links)