Pages that link to "Item:Q2026982"
From MaRDI portal
The following pages link to Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers (Q2026982):
Displaying 6 items.
- Unrelated Parallel Machine Scheduling with Job Splitting, Setup Time, Learning Effect, Processing Cost and Machine Eligibility (Q6053524) (← links)
- Scheduling multi-staged jobs on parallel identical machines and a central server with sequence-dependent setup times: an application to an automated kitchen (Q6068710) (← links)
- A MIP model and a hybrid genetic algorithm for flexible job-shop scheduling problem with job-splitting (Q6164605) (← links)
- Solving an unrelated parallel machines scheduling problem with machine- and job-dependent setups and precedence constraints considering support machines (Q6551117) (← links)
- Minimizing the makespan on two parallel machines with a common server in charge of loading and unloading operations (Q6568449) (← links)
- Minimization of maximum lateness on parallel machines with a single server and job release dates (Q6614640) (← links)