Pages that link to "Item:Q2026991"
From MaRDI portal
The following pages link to Parallel machine scheduling with the total weighted delivery time performance measure in distributed manufacturing (Q2026991):
Displaying 5 items.
- The due date assignment scheduling problem with the deteriorating jobs and delivery time (Q2089176) (← links)
- Unrelated parallel machine scheduling with eligibility constraints and delivery times to minimize total weighted tardiness (Q2108098) (← links)
- An efficient GRASP-like algorithm for the multi-product straight pipeline scheduling problem (Q2108188) (← links)
- Parallel batch processing machines scheduling in cloud manufacturing for minimizing total service completion time (Q2676295) (← links)
- Exact and matheuristic methods for the parallel machine scheduling and location problem with delivery time and due date (Q2676340) (← links)