Pages that link to "Item:Q2140160"
From MaRDI portal
The following pages link to A multi-objective optimization approach for exploring the cost and makespan trade-off in additive manufacturing (Q2140160):
Displaying 5 items.
- Scheduling unrelated additive manufacturing machines with practical constraints (Q2147124) (← links)
- Exact method based on solution space cut for bi-objective Seru production (Q6059586) (← links)
- Particle swarm optimization for integrated scheduling problem with batch additive manufacturing and batch direct-shipping delivery (Q6065621) (← links)
- An overview on the use of operations research in additive manufacturing (Q6099430) (← links)
- Nesting and scheduling optimization of additive manufacturing systems: mapping the territory (Q6561243) (← links)