Pages that link to "Item:Q2190270"
From MaRDI portal
The following pages link to A survey of due-date related single-machine with two-agent scheduling problem (Q2190270):
Displaying 3 items.
- Pareto-scheduling of two competing agents with their own equal processing times (Q2140187) (← links)
- Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost (Q2144217) (← links)
- Proportionate Flow Shop Scheduling with Two Competing Agents to Minimize Weighted Late Work and Weighted Number of Late Jobs (Q5012893) (← links)