Pages that link to "Item:Q2239940"
From MaRDI portal
The following pages link to Multiobjective optimization for complex flexible job-shop scheduling problems (Q2239940):
Displaying 6 items.
- A novel hybrid multi-objective algorithm to solve the generalized cubic cell formation problem (Q2108168) (← links)
- Modeling and solving the flow-shop scheduling problem with sequence-dependent setup times by firefly algorithm (case study: automotive industry) (Q2676023) (← links)
- A general efficient neighborhood structure framework for the job-shop and flexible job-shop scheduling problems (Q6096569) (← links)
- Maximizing the service level on the makespan in the stochastic flexible job-shop scheduling problem (Q6106559) (← links)
- A study of deep learning neural network algorithms and genetic algorithms for FJSP (Q6535654) (← links)
- Solving a real-life multi-skill resource-constrained multi-project scheduling problem (Q6588468) (← links)