Pages that link to "Item:Q2243272"
From MaRDI portal
The following pages link to Two competitive agents to minimize the weighted total late work and the total completion time (Q2243272):
Displaying 3 items.
- Single-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late works (Q2083387) (← links)
- Minimizing total weighted late work on a single-machine with non-availability intervals (Q2165284) (← links)
- Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work (Q6057022) (← links)