Pages that link to "Item:Q2250441"
From MaRDI portal
The following pages link to Two-agent single-machine scheduling problem with just-in-time jobs (Q2250441):
Displaying 6 items.
- Proportionate flow shop scheduling with multi-agents to maximize total gains of JIT jobs (Q1640602) (← links)
- Two-agent parallel machine scheduling with a restricted number of overlapped reserved tasks (Q1753463) (← links)
- Pareto-scheduling of two competing agents with their own equal processing times (Q2140187) (← links)
- A just-in-time scheduling problem with two competing agents (Q2228372) (← links)
- Multi-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobs (Q5058931) (← links)
- Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work (Q6076476) (← links)