Pages that link to "Item:Q2253374"
From MaRDI portal
The following pages link to Scheduling batches in flowshop with limited buffers in the shampoo industry (Q2253374):
Displaying 3 items.
- Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption (Q320777) (← links)
- On the integration of diverging material flows into resource-constrained project scheduling (Q2160494) (← links)
- A hybrid method for large-scale short-term scheduling of make-and-pack production processes (Q2356282) (← links)