Pages that link to "Item:Q2256284"
From MaRDI portal
The following pages link to An exact method for scheduling a yard crane (Q2256284):
Displaying 10 items.
- Yard crane scheduling for container storage, retrieval, and relocation (Q724093) (← links)
- Novel time-space network flow formulation and approximate dynamic programming approach for the crane scheduling in a coil warehouse (Q1683060) (← links)
- High multiplicity asymmetric traveling salesman problem with feedback vertex set and its application to storage/retrieval system (Q2029029) (← links)
- Routing two stacking cranes with predetermined container sequences (Q2059087) (← links)
- Twin-crane scheduling during seaside workload peaks with a dedicated handshake area (Q2124909) (← links)
- Interference aware scheduling of triple-crossover-cranes (Q2197327) (← links)
- Yard Crane Scheduling in the Ground Trolley-Based Automated Container Terminal (Q5112420) (← links)
- Optimizing the number of deployed yard cranes in a container terminal (Q5883816) (← links)
- The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions (Q6113444) (← links)
- Models and algorithms for a yard crane scheduling problem in container ports (Q6167632) (← links)