Pages that link to "Item:Q2268505"
From MaRDI portal
The following pages link to A theoretic and practical framework for scheduling in a stochastic environment (Q2268505):
Displaying 11 items.
- Robust execution strategies for project scheduling with unreliable resources and stochastic durations (Q906557) (← links)
- Allocation and scheduling of conditional task graphs (Q969530) (← links)
- Coevolutionary makespan optimisation through different ranking methods for the fuzzy flexible job shop (Q1677019) (← links)
- Stochastic task networks -- trading performance for stability (Q2011606) (← links)
- An analysis on convergence of data-driven approach to ship lock scheduling (Q2227339) (← links)
- A theoretic and practical framework for scheduling in a stochastic environment (Q2268505) (← links)
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints (Q2356119) (← links)
- A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project (Q2434282) (← links)
- Resource-Constrained Scheduling with Non-constant Capacity and Non-regular Activities (Q3133907) (← links)
- Evaluation of a new decision-aid parameter for job shop scheduling under uncertainties (Q5242361) (← links)
- Quick and situ-aware spatiotemporal scheduling for shipbuilding manufacturing (Q6657870) (← links)