Pages that link to "Item:Q2270297"
From MaRDI portal
The following pages link to Balancing stochastic two-sided assembly lines: a chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm (Q2270297):
Displaying 24 items.
- Maximizing the robustness for simple assembly lines with fixed cycle time and limited number of workstations (Q284850) (← links)
- Second order conic approximation for disassembly line design with joint probabilistic constraints (Q320132) (← links)
- An effective hybrid honey bee mating optimization algorithm for balancing mixed-model two-sided assembly lines (Q337254) (← links)
- An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstations (Q339701) (← links)
- Balancing two-sided U-type assembly lines using modified particle swarm optimization algorithm (Q523563) (← links)
- Bi-criteria assembly line balancing by considering flexible operation times (Q651766) (← links)
- A co-evolutionary matheuristic for the car rental capacity-pricing stochastic problem (Q666980) (← links)
- Two-sided assembly line balancing problem of type I: improvements, a simple algorithm and a comprehensive study (Q1652149) (← links)
- Balancing stochastic two-sided assembly line with multiple constraints using hybrid teaching-learning-based optimization algorithm (Q1652273) (← links)
- Comprehensive review and evaluation of heuristics and meta-heuristics for two-sided assembly line balancing problem (Q1652325) (← links)
- Balancing stochastic parallel assembly lines (Q1654354) (← links)
- Minimizing the cycle time in two-sided assembly lines with assignment restrictions: improvements and a simple algorithm (Q1793174) (← links)
- Optimization on production-inventory problem with multistage and varying demand (Q1952905) (← links)
- A Benders' decomposition algorithm with combinatorial cuts for the multi-manned assembly line balancing problem (Q1999621) (← links)
- Robust balancing of transfer lines with blocks of uncertain parallel tasks under fixed cycle time and space restrictions (Q2029912) (← links)
- Assembly line balancing: what happened in the last fifteen years? (Q2140264) (← links)
- Stability factor for robust balancing of simple assembly lines under uncertainty (Q2146745) (← links)
- Two-sided assembly line balancing problem with parallel performance capacity (Q2292341) (← links)
- Assembly line balancing problems with multi-manned stations: a new mathematical formulation and Gantt based heuristic method (Q2399325) (← links)
- Stochastic assembly line balancing: general bounds and reliability-based branch-and-bound algorithm (Q2672079) (← links)
- Adaptive sampling immune algorithm solving joint chance-constrained programming (Q4980283) (← links)
- Balancing stochastic type-II assembly lines: chance-constrained mixed integer and constraint programming models (Q5059480) (← links)
- Robust optimization for U-shaped assembly line worker assignment and balancing problem with uncertain task times (Q5147666) (← links)
- Constraint programming approach for multi-objective two-sided assembly line balancing problem with multi-operator stations (Q6094367) (← links)