The following pages link to A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (Q2273894):
Displaying 25 items.
- Trees social relations optimization algorithm: a new swarm-based metaheuristic technique to solve continuous and discrete optimization problems (Q2076801) (← links)
- A tree search heuristic for the resource constrained project scheduling problem with transfer times (Q2079399) (← links)
- A local search framework for industrial test laboratory scheduling (Q2241157) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Metaheuristics ``In the large'' (Q2242238) (← links)
- Going to the core of hard resource-constrained project scheduling instances (Q2664304) (← links)
- Just-in-time scheduling for a distributed concrete precast flow shop system (Q2668621) (← links)
- An analysis of network and resource indicators for resource-constrained project scheduling problem instances (Q2668709) (← links)
- A survey of adaptive large neighborhood search algorithms and applications (Q2676311) (← links)
- Block structured scheduling using constraint logic programming (Q5145461) (← links)
- (Q5878630) (← links)
- Project scheduling to minimize the makespan under flexible resource profiles and marginal diminishing returns of the resource (Q6065637) (← links)
- Local search approaches for the test laboratory scheduling problem with variable task grouping (Q6090219) (← links)
- New pseudo polynomial algorithms for a partial resource-constrained project scheduling problem (Q6102886) (← links)
- A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem (Q6106590) (← links)
- A DRL based approach for adaptive scheduling of one-of-a-kind production (Q6106605) (← links)
- Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework (Q6109248) (← links)
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310) (← links)
- The stochastic pseudo-star degree centrality problem (Q6112539) (← links)
- A systematic review of multi-objective hybrid flow shop scheduling (Q6112731) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)
- Multi-objective evolutionary optimization based on online perceiving Pareto front characteristics (Q6139521) (← links)
- New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms (Q6164372) (← links)
- Tabu search for proactive project scheduling problem with flexible resources (Q6164385) (← links)
- An effective population-based iterated greedy algorithm for solving the multi-AGV scheduling problem with unloading safety detection (Q6179985) (← links)