Pages that link to "Item:Q2275834"
From MaRDI portal
The following pages link to An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging (Q2275834):
Displayed 4 items.
- Depth-first heuristic search for the job shop scheduling problem (Q363574) (← links)
- On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times (Q695342) (← links)
- An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times (Q1761844) (← links)
- Mixed integer programming in production planning with backlogging and setup carryover: modeling and algorithms (Q2393142) (← links)