Pages that link to "Item:Q2294524"
From MaRDI portal
The following pages link to Robust absolute single machine makespan scheduling-location problem on trees (Q2294524):
Displaying 6 items.
- 2-approximation algorithm for minmax absolute maximum lateness scheduling-location problem (Q2102848) (← links)
- Robust single machine makespan scheduling with release date uncertainty (Q2661573) (← links)
- An exact framework for the discrete parallel machine scheduling location problem (Q2668759) (← links)
- Exact and matheuristic methods for the parallel machine scheduling and location problem with delivery time and due date (Q2676340) (← links)
- Novel Formulations and Logic-Based Benders Decomposition for the Integrated Parallel Machine Scheduling and Location Problem (Q5086007) (← links)
- Scheduling-location problem with drones (Q6495369) (← links)