Pages that link to "Item:Q2355104"
From MaRDI portal
The following pages link to Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction (Q2355104):
Displaying 5 items.
- Effect of unequal lot sizes, variable setup cost, and carbon emission cost in a supply chain model (Q1665750) (← links)
- Modeling and heuristics for production time crashing in supply chain network design (Q2173131) (← links)
- Production decision making considering dual material types and setup time uncertainty (Q2243494) (← links)
- Process quality adjusted lot sizing and marketing interface in JIT environment (Q2292381) (← links)
- Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach (Q2356184) (← links)