Pages that link to "Item:Q2355885"
From MaRDI portal
The following pages link to A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem (Q2355885):
Displaying 12 items.
- Scheduling resource-constrained projects with a flexible project structure (Q319777) (← links)
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling (Q342339) (← links)
- On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems (Q781900) (← links)
- Multi-mode resource availability cost problem with recruitment and release dates for resources (Q1634132) (← links)
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case (Q1681264) (← links)
- Towards merging binary integer programming techniques with genetic algorithms (Q1748518) (← links)
- A tree search heuristic for the resource constrained project scheduling problem with transfer times (Q2079399) (← links)
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (Q2273894) (← links)
- Fuzzy multi-objective chance-constrained programming model for hazardous materials transportation (Q2817091) (← links)
- Activities planning and resources assignment on distinct places: a mathematical model (Q5247672) (← links)
- (Q5878630) (← links)
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310) (← links)