Pages that link to "Item:Q2356179"
From MaRDI portal
The following pages link to An exact algorithm to minimize mean squared deviation of job completion times about a common due date (Q2356179):
Displaying 3 items.
- The single machine weighted mean squared deviation problem (Q1753598) (← links)
- On the complexity of the single machine scheduling problem minimizing total weighted delay penalty (Q1785249) (← links)
- Identical parallel machine scheduling with assurance of maximum waiting time for an emergency job (Q2185530) (← links)