The following pages link to Scheduling a project to maximize its net present value: An integer programming approach (Q2366079):
Displaying 24 items.
- A genetic algorithm for resource investment problem with discounted cash flows (Q865553) (← links)
- An optimization model for stochastic project networks with cash flows (Q867428) (← links)
- Financing and reliability analysis for schedules in the project calendar planning problem (Q893924) (← links)
- A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations (Q1025246) (← links)
- A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties (Q1036260) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- A comparison of stochastic scheduling rules for maximizing project net present value (Q1127130) (← links)
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations (Q1265850) (← links)
- A framework for an interactive project scheduling system under limited resources (Q1266550) (← links)
- Project network models with discounted cash flows a guided tour through recent developments (Q1278075) (← links)
- A stochastic model to control project duration and expenditure (Q1342014) (← links)
- A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows (Q1373161) (← links)
- Resource-constrained project scheduling: A survey of recent developments. (Q1406618) (← links)
- Which fuzzy ranking method is best for maximizing fuzzy net present value? (Q1640504) (← links)
- Investment decisions and sensitivity analysis: NPV-consistency of rates of return (Q1754333) (← links)
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683) (← links)
- Progress payments in project scheduling problems. (Q1812008) (← links)
- Solving the resource constrained project scheduling problem with optimization subroutine library (Q1919788) (← links)
- The project scheduling problem with irregular starting time costs (Q1969764) (← links)
- On scheduling credited projects (Q2261744) (← links)
- Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times (Q2788529) (← links)
- Client‐contractor bargaining on net present value in project scheduling with limited resources (Q3621917) (← links)
- A constraint-based perspective in resource constrained project scheduling (Q4394226) (← links)
- Work Package Sizing and Project Performance (Q4971582) (← links)