Pages that link to "Item:Q2379662"
From MaRDI portal
The following pages link to Managing and modelling general resource transfers in (multi-)project scheduling (Q2379662):
Displaying 19 items.
- A flow-based tabu search algorithm for the RCPSP with transfer times (Q280159) (← links)
- Resource allocation in multi-class dynamic PERT networks with finite capacity (Q320114) (← links)
- Modeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfers (Q339938) (← links)
- Resource allocation in dynamic PERT networks with finite capacity (Q420887) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (Q1014947) (← links)
- Resource-constrained project scheduling with activity splitting and setup times (Q2003582) (← links)
- Revenue sharing for resource transfer among projects (Q2027026) (← links)
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing (Q2027048) (← links)
- An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers (Q2076410) (← links)
- A tree search heuristic for the resource constrained project scheduling problem with transfer times (Q2079399) (← links)
- Revenue sharing for resource reallocation among project activity contractors (Q2241246) (← links)
- Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times (Q2788529) (← links)
- Project scheduling cost optimization based on resource transfer costs and robustness (Q6065647) (← links)
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310) (← links)
- Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates (Q6112409) (← links)
- Resource-constrained multi-project scheduling problem: a survey (Q6112820) (← links)
- MIP-based solution approaches for multi-site resource-constrained project scheduling (Q6581389) (← links)
- Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns (Q6588469) (← links)