Pages that link to "Item:Q2384842"
From MaRDI portal
The following pages link to A profit-maximizing economic lot scheduling problem with price optimization (Q2384842):
Displaying 4 items.
- Optimal selling price and lotsize with time varying deterioration and partial backlogging (Q708154) (← links)
- Disassembly EOQ models with price-sensitive demands (Q821971) (← links)
- Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach (Q2356184) (← links)
- A common cycle approach for solving the economic lot and inspection scheduling problem (Q2358853) (← links)