Pages that link to "Item:Q2433434"
From MaRDI portal
The following pages link to A hybrid metaheuristic for the resource-constrained project scheduling problem (Q2433434):
Displaying 10 items.
- Scheduling resource-constrained projects with a flexible project structure (Q319777) (← links)
- Solving software project scheduling problems with ant colony optimization (Q339536) (← links)
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling (Q342339) (← links)
- A multi-start evolutionary local search for the two-dimensional loading capacitated vehicle routing problem (Q609809) (← links)
- A hybrid metaheuristic for the prize-collecting single machine scheduling problem with sequence-dependent setup times (Q2270448) (← links)
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (Q2273894) (← links)
- A hybrid heuristic to solve the parallel machines job-shop scheduling problem (Q2378080) (← links)
- A polarized adaptive schedule generation scheme for the resource-constrained project scheduling problem (Q2893339) (← links)
- Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resources (Q6087528) (← links)
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective (Q6568412) (← links)